Funnel

Shape

SCOPE OF SOLUTION:

  • Almost all the clogging or blockage happens between 2m above the flapper-gate and the coal feeding. When blockage never happens in all these areas then you can assume that the problem has been solved.
  • Two (2) m above the flapper-gate we will use bin-rotation anti-blocking product.
  • For the inner of the gate,  we use round architecture and avoid the dead angles of traditional design. We lower the height of gate to decrease the probability of blockage.
  • We lower the height between gate and coal-feeding; and install scrape knife-rotation product.
  • The "Bin-rotation product +special flapper-gate technology + scrape knife-rotation product", in addition with our exclusive control system will solve the blockage.
Coal Feeder Anti clogging Philippines DAtongjaya

Fireplace

Shape

Arch 

Shape

Present Situation of Coal Bin Blockage

Coal Feeder Anti clogging Philippines DAtongjaya
Coal Feeder Anti clogging Philippines DAtongjaya

Traditional Loose Device

Bridge 

Shape

Blockage Shape of Coal Bunker


COAL FEEDER ANTI-CLOGGING SOLUTION

Coal-Fired Power Plant

Coal Feeder Anti clogging Philippines DAtongjaya

PROBLEM: Coal-Fired Power Plant needs a solution to their coal build-up and blockage at their onsite coal-fired power generating station. The coal-fired storage bunker and discharge pockets were being used to collect scrapings from a coal/lime transfer belt system.  The discharge pockets may no longer flowing freely and needs a total solution that will clear this blockage.  This system is necessary to preserve safety of the operation. 

OUR SOLUTION


COAL FEEDER ANTI-CLOGGING SOLUTION provides a total countermeasure to this problem.  This solution is comprehensive because it will not only limited to solving normal blockage of coal bins but also solve the blockage cause by mixed-burning of very poor quality coal such as coal sludge.

Solution of Mix-borning with Brown Coal And Coal Sludge